Saturday, August 25, 2007

Wings


Donna had a trip to Oklahoma City planned for me today but I managed to put in a little time on the project this morning. It sure was hot and humid in the garage even though I had the doors open and a fan blowing on me.


I mounted the flap brace on the left wing and drilled the mounting holes to final size. Then I pulled it off and deburred the holes and edges and smoothed it up. Then I riveted it in place with the cherry max and MSP-42 rivets.


1.5 hours

Wings - 26.5

Empennage - 195 hrs

Total hours on project = 221.5