Wings
After church this morning we came home and I grilled some ribeyes on the grill while Donna made some potato salad and baked beans. By the time we had finished with lunch and the clean-up I was ready to get back to work on the RV-7.
Most of the afternoon was gone already but I managed to install the rod-end bearings and jam nuts on both ends of all four pushrods. That was pretty easy and didn't take too long. Then I installed the aileron bell cranks in both wings.
2 hours
Wings - 15 hrs
Empennage - 195 hrs
Total hours on project = 210
<< Home