Sunday, August 19, 2007

Wings




After church this morning we came home and I grilled some ribeyes on the grill while Donna made some potato salad and baked beans. By the time we had finished with lunch and the clean-up I was ready to get back to work on the RV-7.


Most of the afternoon was gone already but I managed to install the rod-end bearings and jam nuts on both ends of all four pushrods. That was pretty easy and didn't take too long. Then I installed the aileron bell cranks in both wings.


2 hours

Wings - 15 hrs

Empennage - 195 hrs

Total hours on project = 210