Monday, September 04, 2006

Empennage


I assembled the Vertical Stabilizer today. Actually it was a fairly simple process of putting the pieces together. The next step was to final drill all the holes to the correct size on both spars, all the ribs, and the skin. With that done I had to take everything apart and deburr the holes. That's a lot of putting todether and taking apart.

4 Hours

Total hours on project = 66