Friday, June 21, 2013

Fuselage

Today I was able to bolt the seat belt anchors and the F-705H spacer to the lower bulkhead. With that finished I moved on and started on teh F-706 bulkhead. The first step here was to use the unibit to enlarge the rudder cable holes. I did that and then moved on to making the F-729C angle that was shown on drawing DWG 26.
Today: 3 hrs
Fuselage 83 hrs
Wings 148 hrs
Empennage 195  hrs
Total time on project: 427 hrs.