Monday, May 22, 2006

Empennage


Cleco'd the elevator hinge brackets to the rear spar assembly and drilled the holes to the #30 size. Assembled the brackets and the VA-146 bearing assembly together and drilled the holes in the brackets. Deburred the parts and prepped for priming and riveting.

1.5 hours