I spent some time today pulling wires for the components that are in the middle bay of the left wing. I had to splice wires for the control unit for the heated pitot and AOA and pull them in. Then I threaded the wire for the outside temperature probe and pulled it to the end of the wing. When I finished with that I riveted the nutplates on for the access plate that will cover the bellcrank.
4 Hours
Wings - 79 hours
Empennage - 195 hours
Total hours on project = 274